Strona główna»Steel construction
Coframa

Coframa

4 December, 2024

Our Customer uses this tent hall as a storage hall. As agreed, our responsibility was: Execution of the construction’s steel structure; Execution of the steel structure according to the PN-EN 1090 standard; Hot-dip galvanization of the structure according to ISO 1461 standard; Delivery of the PVC tarpaulin for the roof of the hall; Delivery of […]

Read more
Wyszków 20×30

Wyszków 20×30

1 October, 2024

Tent halls produced by our firm are used in different sectors. Presented tent hall is used for storing paper products. Thanks to white tarpaulin, there is no need to use artificial lightening during cloudy days. The Client asked us to: prepare the project of the hall’s construction; execute the steel structure; perform hot-dip galvanization of […]

Read more
Poznań 15x25x5, 4 hale

Poznań 15x25x5, 4 hale

1 October, 2024

The supplier of scaffoldings and boarding for construction uses the tent hall which was manufactured by our firm as a warehouse for his products. Thanks to white tarpaulin on the roof of the steel structure there is no need additional lighting during the day. The walls of the side walls were covered by T18 trapezoidal […]

Read more
Pogodziński

Pogodziński

1 October, 2024

One more example of a tent hall that is used as a horse riding hall. According to the signed order, our tasks included: Project of the hall’s steel structure; Execution of the steel structure; Hot-dip galvanization of the structure acc. to European standards; PVC tarpaulin of 650 gr/m2 with the B-s2, d0 certificate; 1 pcs. […]

Read more
Pogodziński

Pogodziński

1 October, 2024

One more example of a tent hall that is used as a horse riding hall. According to the signed order, our tasks included: Project of the hall’s steel structure; Execution of the steel structure; Hot-dip galvanization of the structure acc. to European standards; PVC tarpaulin of 650 gr/m2 with the B-s2, d0 certificate; 1 pcs. […]

Read more
Janki Auto Max

Janki Auto Max

1 October, 2024

We executed 2 tent halls for our Client. These halls are used in vehicle parts selling business.  Our tasks included: Execution of the tent halls’ construction project design; Execution of a hot-dip galvanized steel structure; Delivery of PVC tarpaulin for the roof covering; Delivery of trapezoidal sheet metals for walls covering; Assembly of the steel […]

Read more
12x48x4 IPE + krata

12x48x4 IPE + krata

1 October, 2024

A tent hall that serves as a storehouse for semi-products. The columns are designed and made from steel I-beams, while the roof structure was made as a steel truss. The entire frame was hot-dip galvanized. This kind of protection from corrosion is being chosen most frequently by our Customers. According to our Client’s wish, we’ve […]

Read more
Potok Wielki

Potok Wielki

5 September, 2024

Manufactured by our team tent hall is used by the customer as a warehouse for carbon, industrial goods and fertilizer wholesale. Our satisfied customer stores his products which cannot be exposed to adverse weather conditions such as, for example, rain. As agreed, we executed: Project of the steel structure; Steel structure; Hot-dip galvanization of the […]

Read more
CMT 02

CMT 02

14 August, 2024

Another realization for our Client from the Czech Republic. This is one of the biggest realizations that we executed until now. Only the structure of the hall itself weighs 256 tons. Execution of this order keeping all the high standards demanded involvement of the entire our team. It was a huge production and also a […]

Read more
Niemcy 10,00 x 20,00 x 4,00 m

10,00 x 20,00 x 4,00 m

23 July, 2024

Gable roof hall / hall with a light structure – 200 m2. A Customer from a carpentry industry/interior design. Truss spacing – about 5,00 m; Roof inclination – 20°; Hot-dip galvanized supporting steel structure; Light band of 18,00 x 1,00 m size from the eave side; Roof covering – T-35 trapezoidal sheet metals of 0,70 […]

Read more